Groundwork Norfolk ConcreteGroundwork Norfolk Concrete

Concrete parking lot building in Norfolk VA - pavement built for your traffic

Need parking for customers, tenants or work trucks? We size the concrete to the vehicles that will use it, so the lot holds up.

Large paved patio with gray rectangular pavers, tiered block retaining walls, and wide concrete steps.
  • Licensed and insured.
  • Free estimates at your property.
  • Expect a reply within 1 business day.

How do you build a concrete parking lot in Norfolk?

Concrete parking lot building in Norfolk, VA starts with preparing the soil the lot sits on, which we call the subgrade, and then placing concrete pavement sized for the cars and trucks that will use it, so it carries that traffic without breaking up.

Most people who call about a lot run a small business or are building something, and they want to know what it'll cost and when they can park on it. The price turns on what will drive across it, from customer cars to delivery trucks, because heavier traffic calls for thicker pavement, and on how much ground work the site needs and how big the lot is. The schedule turns less on the pour than on the planning, because a new lot in Norfolk often needs the city's site plan review, and when it does, we pull the permit. The written estimate from my visit lays out both for your lot.

How we handle concrete parking lot building

I start by asking what parks there now and what you expect to park there later, because I'd rather size the pavement to your traffic than guess at it, and we work with the engineers on your project to match the design to those answers. Before any concrete shows up, our crew gets the subgrade right by digging out spots that are softer, wetter or a different material from the rest, filling them with material like the surrounding ground and packing it all to the same firmness, because a lot on uneven support settles unevenly and cracks where the support changes. Then we set forms to the grades the drainage plan calls for, pour, cut the joints where we planned them, and give the top a broom finish, a light brushed texture that gives tires and shoes some grip in the rain. If the budget gets tight, the base is the last place I'd cut, because nobody sees it on day one and everybody sees it a few years later.

A lot rarely comes by itself. If you're putting in light poles or a sign, we can pour the concrete footings that hold them while we're already set up, and if the building the lot runs up against has settled, look at foundation raising first, so we're not setting the lot's grades against a building that's still moving.

  • Lots for cars and pickups

    This suits offices, shops and rental buildings where customers and tenants park their own vehicles. National design guidance says these lots can usually use thinner concrete without steel reinforcement, which keeps the cost down.

  • Lots that see light trucks

    This suits businesses with delivery vans, box trucks or service vehicles coming through, where thicker pavement is usually needed to carry the weight. If the design calls for steel inside the slab to help hold it together, a structural engineer designs it and we build to that design.

If the lot has to open by a set date, call before the drawings are done, because the engineering and the city's review come before any concrete.

What happens after you call about a parking lot in Norfolk?

Most of the work on a parking lot happens before the concrete truck shows up, in the planning and the paperwork. Here's who does what, from your first call to the final walk.

  1. Tell us about the lot

    Call (757) 731-7228 or send the form with the lot's rough size and the vehicles it will serve now and later. I'm usually the one who comes out, and I'll set a time to see the site.

  2. I walk the site with you

    I look the site over, measure and ask a lot of questions about how the lot will be used. You get a written estimate that spells out the prep, the pour and anything you'll need to plan around, so you can see what's driving the price.

  3. We handle permits and review

    We pull any permit the job needs, list ourselves as the responsible party and set up the inspections. The city says site plan review and final approval typically take 2 to 6 months, depending on the size and scope of the project, so we build that time into the date you need the lot open.

  4. Our crew builds the lot

    Our own crew does the work, with me on site for the pours and the tricky parts, and we give the city at least 48 hours notice before work starts and again when it's finished. Then I walk the finished lot with you before we call it done.

Get a written estimate for your parking lot

Send the lot's rough size and the vehicles it will serve. We reply within one business day and set a time for me to come out for a free estimate at your property, with no pressure and no obligation.

(757) 731-7228

What Norfolk's review means for concrete parking lot building

The rule that shapes a new lot here is Norfolk's site plan review, where the city checks the plan against city and state code for drainage, stormwater, landscaping, lighting, streets and traffic, and any of those can move a curb or trim the paved area. On top of that, Virginia has local governments set standards for keeping disturbed ground and hard surface that water can't soak through to a minimum and for saving existing trees and plants, and those rules apply to some lots, so a plan that paves the whole site may not get through as drawn. When it's not clear what your lot needs, we ask the permit office before we start, not after.

Around Norfolk, a lot of the parking lots we're asked about are tight, squeezed between an older building, the street and the neighbors, so where the water runs off gets settled in the plan instead of after the first hard rain. We're based in Norfolk and work in the cities around it on both sides of the state line, and we plan lots the same way in Chesapeake and Virginia Beach, checking first with each city's own permit office.

Parking lot questions we hear in Norfolk

How much does a concrete parking lot cost in Virginia?

Concrete parking lot construction in Virginia usually costs about $6.50 to $12 per square foot. That's a statewide market range, not our price, and where a lot lands in it depends mostly on the traffic it's built for and how much ground work the site needs. Your own number comes from the written estimate after I walk the site.

Does my parking lot in Norfolk need site plan review?

Usually, yes, because Norfolk requires site plan review when the work disturbs more than 2,500 square feet of land, and most new lots cross that. Past an acre, a state stormwater permit for construction has to come before the city's land disturbing permit. We sort out which of those your lot needs before we schedule anything.

How thick should the concrete be for a parking lot?

The thickness comes from three things, the traffic, how well the ground supports the slab and the strength of the concrete, and an engineer recommends it from those. Under national industry guidance, a geotechnical engineer, the one who studies the ground, recommends the thickness, while a civil engineer sets the concrete strength, joint spacing and drainage. Your part is telling us how many vehicles, and what kind, will use the lot now and later.

What license should a parking lot contractor have in Virginia?

Your contractor should hold a Virginia license in a class that covers the value of your contract, with Class A for a single contract of $150,000 or more, Class B for $30,000 up to $150,000, and Class C for over $1,000 but under $30,000. The state Board for Contractors sets those classes, so ask which one a contractor holds before you sign. We're licensed and insured.

How do I keep a new concrete parking lot from cracking?

You can't stop concrete from cracking entirely, but well-placed joints decide where the cracks go. Control joints are straight cuts made in the slab on purpose, so the cracks form along those lines instead of wandering across the lot. Industry guidance leaves the joint layout to the contractor, so we draw ours up before the pour and cut them on time.

What is the best way to get an accurate parking lot estimate?

Start with the lot's rough size and an honest count of the vehicles that will use it, now and later, including any delivery vans or trucks. Those two things set the thickness, the ground work and the price. When I walk the site, I measure and write up what we'd do and why.

  • Anything standing on or beside the lot, from lights to a fence, needs a footing sized for it, ideally poured before the paving goes around it.

  • If a sticking door, cracked brick or a sloping floor says the building has settled, lifting it first lets the new lot meet it at the right height.

Send us your lot size and vehicles

Call (757) 731-7228, email office@concretenorfolk.com or use our form, and if you have a survey or site plan, send it along so I can study the grades and drainage before I come out.

(757) 731-7228Request an estimate